Request Information
Critical Pathways in Cardiovascular Medicine
- Publication Year:
- 2006
- Edition:
- 2nd Ed.
- Author:
- Cannon, Christopher P., MD; O'Gara, Patrick T., MD
- Publisher:
- Lippincott Williams & Wilkins (LWW)
- ISBN:
- 978-0-78-179439-8
- Doody's Star Rating®:
- Score:
- 92
-
Description
-
Details
-
Also Recommended
Description
Presents evidence-based, cost-effective critical pathways for diagnosis and management of cardiovascular disorders in the pre-hospital setting, emergency department, inpatient setting, and outpatient setti
All pathways in this second edition have been updated to reflect the latest findings regarding best practices in all areas of cardiovascular care. Coverage includes new pathways for pre-hospital care, public access defibrillation for cardiac arrest, emergency department management of heart failure and atrial fibrillation, aortic aneurysm, hyperglycemia, peripheral artery disease and claudication, implantable cardioverter defibrillator treatment for ventricular tachycardia, and long-term management of diabetes and the metabolic syndrome.
All pathways in this second edition have been updated to reflect the latest findings regarding best practices in all areas of cardiovascular care. Coverage includes new pathways for pre-hospital care, public access defibrillation for cardiac arrest, emergency department management of heart failure and atrial fibrillation, aortic aneurysm, hyperglycemia, peripheral artery disease and claudication, implantable cardioverter defibrillator treatment for ventricular tachycardia, and long-term management of diabetes and the metabolic syndrome.
Details
- Platform:
- OvidSP
- Publisher:
- Lippincott Williams & Wilkins (LWW)
- Product Type:
- Book
- Author:
- Cannon, Christopher P., MD; O'Gara, Patrick T., MD
- ISBN:
- 978-0-78-179439-8
- Specialty:
-
- Cardiology
- Emergency Medical Technology
- Emergency Medicine & Trauma
- Internal Medicine
- Language:
- English
- Edition:
- 2nd Ed.
- Pages:
- 336
- Publication Year:
- 2006
- Doody's Star Rating®:
- Score:
- 92
- 5 Minutos de Consulta Clínica
- Advances in Surgical Pathology: Gastric Cancer
- APA PsycTests®
- Berek y Novak. Ginecología
- Clinical Scenarios in Surgery: Decision Making and Operative Technique
- Diabetes Mellitus, guia para el manejo del paciente
- Endocrinología Ginecológica Clínica y Esterilidad
- Enfermedad de Parkinson y trastornos del movimiento
- Evidence-Based Endocrinology
- Fármacos durante el embarazo y la lactancia
- Foot & Ankle Sports Medicine
- Fundamentos de Radiología de Diagnóstico
- Kaplan & Sadock. Manual de bolsillo de psiquiatría clínica
- Kaplan Hipertensión clínica
- Manual de Diálisis
- Manual de Gastroenterología
- Marino. El libro de la UCI
- Neurology Clinical Practice
- Operative Techniques in Spine Surgery
- Synthesizing Economic Evidence
- Synthesizing Evidence from Narrative, Text and Opinion
- Synthesizing Evidence of Diagnostic Accuracy
- Synthesizing Evidence of Risk
- Synthesizing Qualitative Evidence
- Synthesizing Quantitative Evidence
- Translation Science and the JBI Model of Evidence-Based Healthcare
- Tratado de Medicina Cardiovascular
- Vias de Abordaje en Cirugia Ortopedica: Un Enfoque Anatomico
- Wallach. Interpretación clínica de pruebas diagnósticas
- Washington Manual of Critical Care